Timetable only

Arrives: Beverly 14:46

Train MBTA 1225

North Station → Beverly

Follow the real-time schedule of train MBTA 1225 (North Station - Beverly).

What is the route of MBTA 1225?

MBTA 1225 follows the route: Newburyport/Rockport Line.

How long is the journey of MBTA 1225?

The scheduled journey of MBTA 1225 takes approximately 41 minutes.

What type of train is MBTA 1225?

MBTA 1225 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map