Timetable only
Arrives: Beverly 14:46
Train MBTA 1225
North Station → Beverly
Follow the real-time schedule of train MBTA 1225 (North Station - Beverly).
What is the route of MBTA 1225?
MBTA 1225 follows the route: Newburyport/Rockport Line.
How long is the journey of MBTA 1225?
The scheduled journey of MBTA 1225 takes approximately 41 minutes.
What type of train is MBTA 1225?
MBTA 1225 is a MBTA train.
Punctuality history is not available for this train.