Timetable only

Next stop: Shirley 17:55

Train MBTA 4015

North Station → Wachusett

Follow the real-time schedule of train MBTA 4015 (North Station - Wachusett).

What is the route of MBTA 4015?

MBTA 4015 follows the route: Wachusett (Express to South Acton after Porter).

How long is the journey of MBTA 4015?

The scheduled journey of MBTA 4015 takes approximately 1 hour 24 minutes.

What type of train is MBTA 4015?

MBTA 4015 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map