Timetable only

Arrives: Wachusett 17:17

Train MBTA 4013

North Station → Wachusett

Follow the real-time schedule of train MBTA 4013 (North Station - Wachusett).

What is the route of MBTA 4013?

MBTA 4013 follows the route: Fitchburg Line.

How long is the journey of MBTA 4013?

The scheduled journey of MBTA 4013 takes approximately 1 hour 37 minutes.

What type of train is MBTA 4013?

MBTA 4013 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map