Train MBTA 7730
MBTA
Readville โ South Station
17:40Readville
30 minutes
18:10South Station
Follow the real-time schedule of train MBTA 7730 (Readville - South Station).
Stops
No live dataWhat is the route of MBTA 7730?
MBTA 7730 follows the route: South Station via Fairmount.
How long is the journey of MBTA 7730?
The scheduled journey of MBTA 7730 takes approximately 30 minutes.
What type of train is MBTA 7730?
MBTA 7730 is a MBTA train.
Punctuality history
MBTA 7730Punctuality
Average delay