Train MBTA 6302
MBTA
Stoughton โ South Station
05:15Stoughton
39 minutes
05:54South Station
Follow the real-time schedule of train MBTA 6302 (Stoughton - South Station).
Stops
No live dataWhat is the route of MBTA 6302?
MBTA 6302 follows the route: Providence/Stoughton Line.
How long is the journey of MBTA 6302?
The scheduled journey of MBTA 6302 takes approximately 39 minutes.
What type of train is MBTA 6302?
MBTA 6302 is a MBTA train.
Punctuality history
MBTA 6302Punctuality
Average delay