Timetable only
Next stop: Forge Park/495 04:59Arrives: South Station 06:08
Train MBTA 7002
Forge Park/495 → South Station
Follow the real-time schedule of train MBTA 7002 (Forge Park/495 - South Station).
What is the route of MBTA 7002?
MBTA 7002 follows the route: South Station via Back Bay.
How long is the journey of MBTA 7002?
The scheduled journey of MBTA 7002 takes approximately 1 hour 9 minutes.
What type of train is MBTA 7002?
MBTA 7002 is a MBTA train.
Punctuality history is not available for this train.