Timetable only
Next stop: Worcester 16:30Arrives: South Station 17:51
Train MBTA 5032
Worcester → South Station
Follow the real-time schedule of train MBTA 5032 (Worcester - South Station).
What is the route of MBTA 5032?
MBTA 5032 follows the route: South Station (Express to Boston Landing after Framingham).
How long is the journey of MBTA 5032?
The scheduled journey of MBTA 5032 takes approximately 1 hour 21 minutes.
What type of train is MBTA 5032?
MBTA 5032 is a MBTA train.
Punctuality history is not available for this train.