Timetable only

Next stop: South Station 21:00

Train MBTA 6329

South Station → Stoughton

Follow the real-time schedule of train MBTA 6329 (South Station - Stoughton).

What is the route of MBTA 6329?

MBTA 6329 follows the route: Providence/Stoughton Line.

How long is the journey of MBTA 6329?

The scheduled journey of MBTA 6329 takes approximately 39 minutes.

What type of train is MBTA 6329?

MBTA 6329 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map