Timetable only

Arrives: South Station 12:24

Train MBTA 7022

Forge Park/495 → South Station

Follow the real-time schedule of train MBTA 7022 (Forge Park/495 - South Station).

What is the route of MBTA 7022?

MBTA 7022 follows the route: South Station via Back Bay.

How long is the journey of MBTA 7022?

The scheduled journey of MBTA 7022 takes approximately 1 hour 9 minutes.

What type of train is MBTA 7022?

MBTA 7022 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map