Timetable only
Next stop: Forge Park/495 20:00Arrives: South Station 21:04
Train MBTA 7042
Forge Park/495 → South Station
Follow the real-time schedule of train MBTA 7042 (Forge Park/495 - South Station).
What is the route of MBTA 7042?
MBTA 7042 follows the route: South Station via Back Bay.
How long is the journey of MBTA 7042?
The scheduled journey of MBTA 7042 takes approximately 1 hour 4 minutes.
What type of train is MBTA 7042?
MBTA 7042 is a MBTA train.
Punctuality history is not available for this train.