Timetable only
Arrives: Forge Park/495 16:35
Train MBTA 7021
South Station → Forge Park/495
Follow the real-time schedule of train MBTA 7021 (South Station - Forge Park/495).
What is the route of MBTA 7021?
MBTA 7021 follows the route: Forge Park/495 via Back Bay.
How long is the journey of MBTA 7021?
The scheduled journey of MBTA 7021 takes approximately 1 hour 15 minutes.
What type of train is MBTA 7021?
MBTA 7021 is a MBTA train.
Punctuality history is not available for this train.