Timetable only

Arrives: Forge Park/495 16:35

Train MBTA 7021

South Station → Forge Park/495

Follow the real-time schedule of train MBTA 7021 (South Station - Forge Park/495).

What is the route of MBTA 7021?

MBTA 7021 follows the route: Forge Park/495 via Back Bay.

How long is the journey of MBTA 7021?

The scheduled journey of MBTA 7021 takes approximately 1 hour 15 minutes.

What type of train is MBTA 7021?

MBTA 7021 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map