Timetable only
Arrives: Forge Park/495 14:18
Train MBTA 7017
South Station → Forge Park/495
Follow the real-time schedule of train MBTA 7017 (South Station - Forge Park/495).
What is the route of MBTA 7017?
MBTA 7017 follows the route: Forge Park/495 via Back Bay.
How long is the journey of MBTA 7017?
The scheduled journey of MBTA 7017 takes approximately 1 hour 20 minutes.
What type of train is MBTA 7017?
MBTA 7017 is a MBTA train.
Punctuality history is not available for this train.