Timetable only

Arrives: Forge Park/495 14:18

Train MBTA 7017

South Station → Forge Park/495

Follow the real-time schedule of train MBTA 7017 (South Station - Forge Park/495).

What is the route of MBTA 7017?

MBTA 7017 follows the route: Forge Park/495 via Back Bay.

How long is the journey of MBTA 7017?

The scheduled journey of MBTA 7017 takes approximately 1 hour 20 minutes.

What type of train is MBTA 7017?

MBTA 7017 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map