Timetable only
Next stop: South Station 18:35Arrives: Forge Park/495 19:45
Train MBTA 7033
South Station → Forge Park/495
Follow the real-time schedule of train MBTA 7033 (South Station - Forge Park/495).
What is the route of MBTA 7033?
MBTA 7033 follows the route: Forge Park/495 via Back Bay.
How long is the journey of MBTA 7033?
The scheduled journey of MBTA 7033 takes approximately 1 hour 10 minutes.
What type of train is MBTA 7033?
MBTA 7033 is a MBTA train.
Punctuality history is not available for this train.