Timetable only

Next stop: South Station 18:35

Train MBTA 7033

South Station → Forge Park/495

Follow the real-time schedule of train MBTA 7033 (South Station - Forge Park/495).

What is the route of MBTA 7033?

MBTA 7033 follows the route: Forge Park/495 via Back Bay.

How long is the journey of MBTA 7033?

The scheduled journey of MBTA 7033 takes approximately 1 hour 10 minutes.

What type of train is MBTA 7033?

MBTA 7033 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map