Timetable only
Arrives: South Station 07:43
Train MBTA 7008
Forge Park/495 → South Station
Follow the real-time schedule of train MBTA 7008 (Forge Park/495 - South Station).
What is the route of MBTA 7008?
MBTA 7008 follows the route: South Station via Back Bay.
How long is the journey of MBTA 7008?
The scheduled journey of MBTA 7008 takes approximately 1 hour 10 minutes.
What type of train is MBTA 7008?
MBTA 7008 is a MBTA train.
Punctuality history is not available for this train.