Timetable only

Arrives: Forge Park/495 13:01

Train MBTA 7013

South Station → Forge Park/495

Follow the real-time schedule of train MBTA 7013 (South Station - Forge Park/495).

What is the route of MBTA 7013?

MBTA 7013 follows the route: Forge Park/495 via Back Bay.

How long is the journey of MBTA 7013?

The scheduled journey of MBTA 7013 takes approximately 1 hour 11 minutes.

What type of train is MBTA 7013?

MBTA 7013 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map