Timetable only

Arrives: South Station 05:45

Train MBTA 6402

Needham Heights → South Station

Follow the real-time schedule of train MBTA 6402 (Needham Heights - South Station).

What is the route of MBTA 6402?

MBTA 6402 follows the route: Needham Line.

How long is the journey of MBTA 6402?

The scheduled journey of MBTA 6402 takes approximately 40 minutes.

What type of train is MBTA 6402?

MBTA 6402 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map