Timetable only

Arrives: Worcester 14:30

Train MBTA 5021

South Station → Worcester

Follow the real-time schedule of train MBTA 5021 (South Station - Worcester).

What is the route of MBTA 5021?

MBTA 5021 follows the route: Worcester (Express to Wellesley Farms after Boston Landing).

How long is the journey of MBTA 5021?

The scheduled journey of MBTA 5021 takes approximately 1 hour 35 minutes.

What type of train is MBTA 5021?

MBTA 5021 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map