Timetable only
Arrives: Worcester 16:14
Train MBTA 5025
South Station → Worcester
Follow the real-time schedule of train MBTA 5025 (South Station - Worcester).
What is the route of MBTA 5025?
MBTA 5025 follows the route: Framingham/Worcester Line.
How long is the journey of MBTA 5025?
The scheduled journey of MBTA 5025 takes approximately 1 hour 34 minutes.
What type of train is MBTA 5025?
MBTA 5025 is a MBTA train.
Punctuality history is not available for this train.