Timetable only

Arrives: South Station 17:51

Train MBTA 5032

Worcester → South Station

Follow the real-time schedule of train MBTA 5032 (Worcester - South Station).

What is the route of MBTA 5032?

MBTA 5032 follows the route: South Station (Express to Boston Landing after Framingham).

How long is the journey of MBTA 5032?

The scheduled journey of MBTA 5032 takes approximately 1 hour 21 minutes.

What type of train is MBTA 5032?

MBTA 5032 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map