Timetable only

Arrives: South Station 10:46

Train MBTA 5016

Worcester → South Station

Follow the real-time schedule of train MBTA 5016 (Worcester - South Station).

What is the route of MBTA 5016?

MBTA 5016 follows the route: Framingham/Worcester Line.

How long is the journey of MBTA 5016?

The scheduled journey of MBTA 5016 takes approximately 1 hour 41 minutes.

What type of train is MBTA 5016?

MBTA 5016 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map