Timetable only
Arrives: South Station 14:52
Train MBTA 6420
Needham Heights → South Station
Follow the real-time schedule of train MBTA 6420 (Needham Heights - South Station).
What is the route of MBTA 6420?
MBTA 6420 follows the route: Needham Line.
How long is the journey of MBTA 6420?
The scheduled journey of MBTA 6420 takes approximately 47 minutes.
What type of train is MBTA 6420?
MBTA 6420 is a MBTA train.
Punctuality history is not available for this train.