Timetable only
Next stop: Stoughton 20:05Arrives: South Station 20:43
Train MBTA 6330
Stoughton → South Station
Follow the real-time schedule of train MBTA 6330 (Stoughton - South Station).
What is the route of MBTA 6330?
MBTA 6330 follows the route: Providence/Stoughton Line.
How long is the journey of MBTA 6330?
The scheduled journey of MBTA 6330 takes approximately 38 minutes.
What type of train is MBTA 6330?
MBTA 6330 is a MBTA train.
Punctuality history is not available for this train.