Timetable only

Next stop: Stoughton 20:05

Train MBTA 6330

Stoughton → South Station

Follow the real-time schedule of train MBTA 6330 (Stoughton - South Station).

What is the route of MBTA 6330?

MBTA 6330 follows the route: Providence/Stoughton Line.

How long is the journey of MBTA 6330?

The scheduled journey of MBTA 6330 takes approximately 38 minutes.

What type of train is MBTA 6330?

MBTA 6330 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map