Timetable only

Arrives: Needham Heights 07:37

Train MBTA 6401

South Station → Needham Heights

Follow the real-time schedule of train MBTA 6401 (South Station - Needham Heights).

What is the route of MBTA 6401?

MBTA 6401 follows the route: Needham Line.

How long is the journey of MBTA 6401?

The scheduled journey of MBTA 6401 takes approximately 47 minutes.

What type of train is MBTA 6401?

MBTA 6401 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map