Timetable only
Arrives: South Station 14:29
Train MBTA 6024
Providence → South Station
Follow the real-time schedule of train MBTA 6024 (Providence - South Station).
What is the route of MBTA 6024?
MBTA 6024 follows the route: Providence/Stoughton Line.
How long is the journey of MBTA 6024?
The scheduled journey of MBTA 6024 takes approximately 1 hour 14 minutes.
What type of train is MBTA 6024?
MBTA 6024 is a MBTA train.
Punctuality history is not available for this train.