Timetable only

Next stop: South Station 21:20

Train MBTA 6429

South Station → Needham Heights

Follow the real-time schedule of train MBTA 6429 (South Station - Needham Heights).

What is the route of MBTA 6429?

MBTA 6429 follows the route: Needham Line.

How long is the journey of MBTA 6429?

The scheduled journey of MBTA 6429 takes approximately 42 minutes.

What type of train is MBTA 6429?

MBTA 6429 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map