Timetable only
Arrives: South Station 10:53
Train MBTA 6312
Stoughton → South Station
Follow the real-time schedule of train MBTA 6312 (Stoughton - South Station).
What is the route of MBTA 6312?
MBTA 6312 follows the route: Providence/Stoughton Line.
How long is the journey of MBTA 6312?
The scheduled journey of MBTA 6312 takes approximately 38 minutes.
What type of train is MBTA 6312?
MBTA 6312 is a MBTA train.
Punctuality history is not available for this train.