Timetable only

Arrives: South Station 10:53

Train MBTA 6312

Stoughton → South Station

Follow the real-time schedule of train MBTA 6312 (Stoughton - South Station).

What is the route of MBTA 6312?

MBTA 6312 follows the route: Providence/Stoughton Line.

How long is the journey of MBTA 6312?

The scheduled journey of MBTA 6312 takes approximately 38 minutes.

What type of train is MBTA 6312?

MBTA 6312 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map