Timetable only
Arrives: Stoughton 09:45
Train MBTA 6307
South Station → Stoughton
Follow the real-time schedule of train MBTA 6307 (South Station - Stoughton).
What is the route of MBTA 6307?
MBTA 6307 follows the route: Providence/Stoughton Line.
How long is the journey of MBTA 6307?
The scheduled journey of MBTA 6307 takes approximately 40 minutes.
What type of train is MBTA 6307?
MBTA 6307 is a MBTA train.
Punctuality history is not available for this train.