Timetable only

Arrives: South Station 07:41

Train MBTA 6008

Wickford Junction → South Station

Follow the real-time schedule of train MBTA 6008 (Wickford Junction - South Station).

What is the route of MBTA 6008?

MBTA 6008 follows the route: South Station (Express to Ruggles after Sharon).

How long is the journey of MBTA 6008?

The scheduled journey of MBTA 6008 takes approximately 1 hour 39 minutes.

What type of train is MBTA 6008?

MBTA 6008 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map