Timetable only
Arrives: South Station 09:50
Train MBTA 6410
Needham Heights → South Station
Follow the real-time schedule of train MBTA 6410 (Needham Heights - South Station).
What is the route of MBTA 6410?
MBTA 6410 follows the route: Needham Line.
How long is the journey of MBTA 6410?
The scheduled journey of MBTA 6410 takes approximately 45 minutes.
What type of train is MBTA 6410?
MBTA 6410 is a MBTA train.
Punctuality history is not available for this train.