Timetable only
Next stop: Worcester 22:50Arrives: South Station 00:18
Train MBTA 5042
Worcester → South Station
Follow the real-time schedule of train MBTA 5042 (Worcester - South Station).
What is the route of MBTA 5042?
MBTA 5042 follows the route: South Station (Express to Boston Landing after Wellesley Farms).
How long is the journey of MBTA 5042?
The scheduled journey of MBTA 5042 takes approximately 1 hour 28 minutes.
What type of train is MBTA 5042?
MBTA 5042 is a MBTA train.
Punctuality history is not available for this train.