Timetable only

Next stop: East Taunton 19:01

Train MBTA 8171

East Taunton → Fall River Depot

Follow the real-time schedule of train MBTA 8171 (East Taunton - Fall River Depot).

What is the route of MBTA 8171?

MBTA 8171 follows the route: Fall River/New Bedford Line.

How long is the journey of MBTA 8171?

The scheduled journey of MBTA 8171 takes approximately 24 minutes.

What type of train is MBTA 8171?

MBTA 8171 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map