Timetable only

Arrives: South Station 06:13

Train MBTA 8402

Greenbush → South Station

Follow the real-time schedule of train MBTA 8402 (Greenbush - South Station).

What is the route of MBTA 8402?

MBTA 8402 follows the route: Greenbush Line.

How long is the journey of MBTA 8402?

The scheduled journey of MBTA 8402 takes approximately 58 minutes.

What type of train is MBTA 8402?

MBTA 8402 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map