Timetable only
Arrives: South Station 15:44
Train MBTA 8022
New Bedford → South Station
Follow the real-time schedule of train MBTA 8022 (New Bedford - South Station).
What is the route of MBTA 8022?
MBTA 8022 follows the route: Fall River/New Bedford Line.
How long is the journey of MBTA 8022?
The scheduled journey of MBTA 8022 takes approximately 1 hour 40 minutes.
What type of train is MBTA 8022?
MBTA 8022 is a MBTA train.
Punctuality history is not available for this train.