Timetable only

Arrives: Readville 09:47

Train MBTA 7213

South Station → Readville

Follow the real-time schedule of train MBTA 7213 (South Station - Readville).

What is the route of MBTA 7213?

MBTA 7213 follows the route: Readville via Fairmount.

How long is the journey of MBTA 7213?

The scheduled journey of MBTA 7213 takes approximately 30 minutes.

What type of train is MBTA 7213?

MBTA 7213 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map