Timetable only

Arrives: East Taunton 07:39

Train MBTA 8160

Fall River Depot → East Taunton

Follow the real-time schedule of train MBTA 8160 (Fall River Depot - East Taunton).

What is the route of MBTA 8160?

MBTA 8160 follows the route: East Taunton & South Station.

How long is the journey of MBTA 8160?

The scheduled journey of MBTA 8160 takes approximately 21 minutes.

What type of train is MBTA 8160?

MBTA 8160 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map