Timetable only

Arrives: Fall River Depot 08:34

Train MBTA 8101

South Station → Fall River Depot

Follow the real-time schedule of train MBTA 8101 (South Station - Fall River Depot).

What is the route of MBTA 8101?

MBTA 8101 follows the route: Fall River & New Bedford.

How long is the journey of MBTA 8101?

The scheduled journey of MBTA 8101 takes approximately 1 hour 49 minutes.

What type of train is MBTA 8101?

MBTA 8101 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map