Timetable only
Arrives: Fall River Depot 18:47
Train MBTA 8119
South Station → Fall River Depot
Follow the real-time schedule of train MBTA 8119 (South Station - Fall River Depot).
What is the route of MBTA 8119?
MBTA 8119 follows the route: Fall River/New Bedford Line.
How long is the journey of MBTA 8119?
The scheduled journey of MBTA 8119 takes approximately 1 hour 42 minutes.
What type of train is MBTA 8119?
MBTA 8119 is a MBTA train.
Punctuality history is not available for this train.