Timetable only
Next stop: Quincy Center 19:50Arrives: Fall River Depot 21:18
Train MBTA 8125
South Station → Fall River Depot
Follow the real-time schedule of train MBTA 8125 (South Station - Fall River Depot).
What is the route of MBTA 8125?
MBTA 8125 follows the route: Fall River & New Bedford.
How long is the journey of MBTA 8125?
The scheduled journey of MBTA 8125 takes approximately 1 hour 43 minutes.
What type of train is MBTA 8125?
MBTA 8125 is a MBTA train.
Punctuality history is not available for this train.