Timetable only
Arrives: New Bedford 18:26
Train MBTA 8017
South Station → New Bedford
Follow the real-time schedule of train MBTA 8017 (South Station - New Bedford).
What is the route of MBTA 8017?
MBTA 8017 follows the route: Fall River/New Bedford Line.
How long is the journey of MBTA 8017?
The scheduled journey of MBTA 8017 takes approximately 1 hour 46 minutes.
What type of train is MBTA 8017?
MBTA 8017 is a MBTA train.
Punctuality history is not available for this train.