Timetable only

Next stop: Greenbush 22:32

Train MBTA 8424

Greenbush → South Station

Follow the real-time schedule of train MBTA 8424 (Greenbush - South Station).

What is the route of MBTA 8424?

MBTA 8424 follows the route: Greenbush Line.

How long is the journey of MBTA 8424?

The scheduled journey of MBTA 8424 takes approximately 56 minutes.

What type of train is MBTA 8424?

MBTA 8424 is a MBTA train.

Punctuality history is not available for this train.

Trains on mapTrains on map