Timetable only
Next stop: PADANG BESAR 21:35Arrives: BUTTERWORTH 23:26
Train Padang Besar Line 2967
PADANG BESAR → BUTTERWORTH
Follow the real-time schedule of train Padang Besar Line 2967 (PADANG BESAR - BUTTERWORTH).
What is the route of Padang Besar Line 2967?
Padang Besar Line 2967 follows the route: Padang Besar Line.
How long is the journey of Padang Besar Line 2967?
The scheduled journey of Padang Besar Line 2967 takes approximately 1 hour 51 minutes.
What type of train is Padang Besar Line 2967?
Padang Besar Line 2967 is a Padang Besar Line train.
Punctuality history is not available for this train.