Timetable only
Arrives: PADANG BESAR 10:26
Train Padang Besar Line 2912
BUTTERWORTH → PADANG BESAR
Follow the real-time schedule of train Padang Besar Line 2912 (BUTTERWORTH - PADANG BESAR).
What is the route of Padang Besar Line 2912?
Padang Besar Line 2912 follows the route: Padang Besar Line.
How long is the journey of Padang Besar Line 2912?
The scheduled journey of Padang Besar Line 2912 takes approximately 1 hour 51 minutes.
What type of train is Padang Besar Line 2912?
Padang Besar Line 2912 is a Padang Besar Line train.
Punctuality history is not available for this train.