Timetable only
Arrives: BUTTERWORTH 07:31
Train Padang Besar Line 2903
PADANG BESAR → BUTTERWORTH
Follow the real-time schedule of train Padang Besar Line 2903 (PADANG BESAR - BUTTERWORTH).
What is the route of Padang Besar Line 2903?
Padang Besar Line 2903 follows the route: Padang Besar Line.
How long is the journey of Padang Besar Line 2903?
The scheduled journey of Padang Besar Line 2903 takes approximately 1 hour 51 minutes.
What type of train is Padang Besar Line 2903?
Padang Besar Line 2903 is a Padang Besar Line train.
Punctuality history is not available for this train.