Timetable only

Arrives: BUTTERWORTH 10:51

Train Ipoh Line 2812

IPOH → BUTTERWORTH

Follow the real-time schedule of train Ipoh Line 2812 (IPOH - BUTTERWORTH).

What is the route of Ipoh Line 2812?

Ipoh Line 2812 follows the route: Ipoh Line.

How long is the journey of Ipoh Line 2812?

The scheduled journey of Ipoh Line 2812 takes approximately 1 hour 56 minutes.

What type of train is Ipoh Line 2812?

Ipoh Line 2812 is a Ipoh Line train.

Punctuality history is not available for this train.

Trains on mapTrains on map