Timetable only
Arrives: BATU GAJAH 17:32
Train ETS 1054
KL SENTRAL → BATU GAJAH
Follow the real-time schedule of train ETS 1054 (KL SENTRAL - BATU GAJAH).
What is the route of ETS 1054?
ETS 1054 follows the route: ETS.
How long is the journey of ETS 1054?
The scheduled journey of ETS 1054 takes approximately 2 hours 42 minutes.
What type of train is ETS 1054?
ETS 1054 is a ETS train.
Punctuality history is not available for this train.