Train disruptions
Current train service disruptions and network alerts, updated in real time.
AI translated
- RE1 rhr5
Measures and timetables: RE 1 (RRX) — Due to bridge works, track and switch renewal works, and platform works, there will be diversions and partial cancellations on line RE 1 (RRX) from 21.08.2026 (21:00) to 04.12.2026 (21:00) between Düsseldorf Hbf and Köln-Mülheim.
Hamm (Westf), Hauptbahnhof → Aachen, Hbf
- S5 ay42
Pforzheim Hbf - Söllingen (b Karlsruhe): S5 - Individual trains are cancelled at night in December — (AVG) Pforzheim Hbf – Söllingen (b Karlsruhe): S5 – Individual trains are cancelled at night Line(s): S5 Period: Night of 04./05.12. (approx. 21:00 to 01:00) Cancellation Tram: Pforzheim Hbf <-> Söllingen (b Karlsruhe), approx. every second train affected: o Pforzheim Hbf (21:46) – Söllingen (b KA) (22:09) – Wörth Badepark o Pforzheim Hbf (22:46) – Söllingen (b KA) (23:09) – Karlsruhe Rheinbergstraße o Pforzheim Hbf (00:06) – Söllingen (b KA) (00:29) – Karlsruhe Rheinbergstraße o Wörth Badepark (20:45) – Söllingen (b KA) (21:45) – Pforzheim Hbf (22:10) o Wörth Badepark (21:45) – Söllingen (b KA) (22:45) – Pforzheim Hbf (23:10) o Karlsruhe Rheinbergstraße (22:42) – Söllingen (b KA) (23:25) – Pforzheim Hbf (23:50) Replacement service: for the cancelled connections, Pforzheim Hbf <-> Söllingen Reetztstraße Reason: DB InfraGO – maintenance window
Pforzheim Hauptbahnhof → Knielingen Rheinbergstraße
- ICE 25 19sn1
Today without a vehicle-mounted entry assistance — Today without a vehicle-mounted entry assistance
München Hbf → Hamburg, Hamburg Hbf
- MEX18 1a23m
Heilbronn - Bietigheim: Night train cancellations due to maintenance measures — Due to maintenance measures, on lines MEX12/18 during the night of 5./6. December from approximately 22:00 to 05:00, and on the nights until 9./10. December 2026 from approximately 22:00 to 01:00 each time, there will be train cancellations between Bietigheim and Heilbronn. Replacement buses are running.
Lauffen (N) → Osterburken, Bahnhof
- S5 ay42
Wörth Badepark – Knielingen Rheinbergstraße: Section of S5 cancelled from 22:00 — (AVG) Wörth Badepark – Knielingen Rheinbergstraße: Section of S5 cancelled from 22:00 Line(s): S5 Period: Night of 18./19.12.2026 (22:00 to 05:00) Tram cancellation: Wörth Badepark <-> Knielingen Rheinbergstraße Replacement service: Wörth Berufsschule <-> Knielingen Rheinbergstraße Reason: DB InfraGO – maintenance window in the area of the Rhine Bridge
Pforzheim Hauptbahnhof → Knielingen Rheinbergstraße
- ICE 10 mcjo
Information. — Different vehicle. Reduced number of seats. On-board restaurant/bistro car 26 & 36. Bicycle spaces in car 24 & 34. Wheelchair-accessible facilities in car 22 & 32. In case of required rebookings, contact the mobility service center.
S+U Berlin Hauptbahnhof → Köln Hbf
- RE8 w12
Neckarsulm - Stuttgart: Morning train cancellation due to construction works — Due to construction works, the train from Neckarsulm at 06:32 to Stuttgart Hbf is cancelled on 30 November 2026.
Würzburg Hbf → Hauptbahnhof
- MEX13 s591
Stuttgart - Aalen/Crailsheim: Night train cancellations due to maintenance measures — Due to maintenance measures, on the nights of 3./4. to 5./6. December 2026, individual trains of lines RE1 and MEX13 between Stuttgart and Aalen/Crailsheim will be cancelled from approximately 21:15 to 01:00. Replacement buses will run in part. Please check your connections in advance.
Aalen, Hauptbahnhof → Hauptbahnhof
- S8 11igu
Gernsbach - Forbach - Baiersbronn: S8 interrupted over two nights — (AVG) Gernsbach – Forbach – Baiersbronn: S8 interrupted over two nights Line(s): S8 Period: Nights 01./12. and 02./03.12. (each approx. 21:30 – 04:00) Cancellation Tram: • Gernsbach <-> Forbach (Schwarzw), on the night of 01./02.12. • Forbach (Schwarzw) <-> Baiersbronn, on the night of 02./03.12. Replacement service: • Gernsbach <-> Forbach (Schwarzw), on the night of 01./02.12. • Forbach (Schwarzw) <-> Baiersbronn, on the night of 02./03.12. Reason: AVG - tunnel inspection
Freudenstadt Hauptbahnhof → KA Tullastraße/Alter Schlachthof
- S7 14dae
Rastatt - Achern: S7/S71 cancelled for two weeks — (AVG) Rastatt – Achern: S7/S71 cancelled for two weeks Lines: S7, S71 Period: Monday 23.11. (5:00 a.m.) until Wednesday 09.12.2026 (10:00 p.m.) Cancellation of tram service: Rastatt <-> Baden-Baden <-> Bühl (Baden) <-> Achern Replacement service: • Replacement buses Rastatt <-> Baden-Baden <-> Bühl (Baden) • Achern: Please use RE2 Reason: DB InfraGO – construction work Other: • Individual trains that start and end in Baden-Baden may run • Please note that trains on line RB44 operated by DB Regio are also affected
Rastatt → KA Tullastraße/Alter Schlachthof
- S3 pwuu
WLAN available — WLAN available
Neumarkt (Oberpf) → Nürnberg Hbf
- RE11 188v
Line RE11: Air conditioning — Line RE11: Air conditioning
Kassel Bahnhof Wilhelmshöhe → Duisburg Hbf
- RB69 lazb
RB 69: Individual timetable changes between Kaufering and Landsberg from 17.08. to 10.12.26 — Due to construction work, on line RB 69 from 17.08. to 10.12.2026 between Kaufering and Landsberg (Lech), some trains will have earlier or later departure times. Further information can be found in the attached construction timetable.
Augsburg Hbf → Kaufering
- S8 q4kz
S1/S2/S4/S6/S8: Train cancellations and altered routes between Pasing and Ostbahnhof/Trudering/Leuchtenbergring/Riem (27 to 30 November) — Due to construction work for the 2nd Stammstrecke at Leuchtenbergring, from Friday, 27 November 2026, 22:10, continuously until Monday, 30 November 2026, 4:40, the following changes apply: S1: Trains in/from the direction of Freising/Airport begin/end at Ostbahnhof and are cancelled between Ostbahnhof and Leuchtenbergring. S2: Trains in/from the direction of Erding begin/end at Ostbahnhof Gl. 6-13 and run from/to Riem without stopping. Between Markt Schwaben and Erding, there is replacement bus service due to other construction work. Trains in/from the direction of Petershausen/Altomünster begin/end at Ostbahnhof. On the night of Saturday/Sunday, 28./29. November, and during the day on Sunday, 29. November, additional construction work takes place between Hirschgarten/Laim and Allach/Dachau. S4: Trains in/from the direction of Geltendorf begin/end in Pasing. Trains in/from the direction of Zorneding/Trudering are cancelled between Pasing and Trudering/Zorneding. S6: Trains in/from the direction of Ebersberg begin/end in Trudering. Trains in/from the direction of Tutzing begin/end at Heimeranplatz platform 11. S8: Trains from the direction of the Airport to Herrsching run at Leuchtenbergring on a track other than platform 4. The remaining S-Bahn lines run as scheduled.
Herrsching → Flughafen München
- ICE 20 162b5
No accessible toilet on the train. Please contact our Mobility Service Center for any necessary rebookings. — No accessible toilet on the train. Passengers with reduced mobility should contact our Mobility Service Center regarding any necessary rebookings.
Hamburg, Dammtor (Messe/CCH) → Karlsruhe Hauptbahnhof
- ICE 62 92p1
Another vehicle. Dining car/Bistro car 26. Replacement bicycle spaces in car 28. Reduced number of bicycle spaces. Wheelchair-accessible facilities in car 25. No vehicle-specific boarding aid. In case of required rebookings, please contact the Mobility Service Center. — The train is running with another vehicle. Dining car/Bistro car 26. The replacement bicycle spaces are located in car 28. Due to the reduced number of bicycle spaces, taking bicycles on board may not be possible. Wheelchair-accessible facilities in car 25. No vehicle-specific boarding aid. Passengers with reduced mobility should contact our Mobility Service Center regarding any necessary rebookings.
Hauptbahnhof → Darmstadt Hauptbahnhof
- IC 55 1ew8u
The train is unfortunately cancelled. Reason: construction work. — The train is unfortunately cancelled. The reason is construction work.
Leipzig Hbf → Hauptbahnhof
- S3 bt21
Vaihingen bzw. Flughafen/Messe - Filderstadt: overnight train cancellations with replacement buses due to construction work — Due to construction work, the following schedule changes apply: Nights of 13/14 to 16/17 December 2026 S2: from approximately 21:40 to 02:00, trains between Flughafen/Messe and Filderstadt are cancelled. Replacement buses run from Flughafen/Messe SAB to Filderstadt Bahnhof (Volmarstraße). Night of 17/18 December 2026 S2 and S3: from approximately 21:40 to 02:00, trains between Vaihingen and Filderstadt are cancelled. Replacement buses run from Vaihingen ZOB to Filderstadt Bahnhof (Volmarstraße).
Backnang → Flughafen/Messe
- IC 87 8gna
Bicycle carriage requires reservation — Bicycle carriage requires reservation
Schaffhausen → Hauptbahnhof
- EC 62 9n0z
Section — snacks and drinks available — Section — snacks and drinks available
Villach Hbf → Salzburg Hbf
- ICE 33 1ej71
Line 33: Comfort check-in available - please check in if possible — Line 33: Comfort check-in available - please check in if possible
Köln Hbf → Greifswald
- RB26 lkx2
No wheelchair-accessible facilities, no accessible toilet on board. Passengers with reduced mobility can contact our Mobility Service Center regarding any possibly necessary rebookings. (Phone: 030 65212888; E-mail: msz@deutschebahn.com) — No wheelchair-accessible facilities, no accessible toilet on board. Passengers with reduced mobility can contact our Mobility Service Center regarding any possibly necessary rebookings. (Phone: 030 65212888; E-mail: msz@deutschebahn.com)
Offenburg Bahnhof → Freiburg Hauptbahnhof
- S11 5kx4
The train only runs as far as Gottenheim. There, an unplanned change of trains towards Freiburg(Breisgau) is required. Continue your journey from Gottenheim with the S1 running at the same time, departing from platform 2. Please check your connection. — The train only runs as far as Gottenheim. There, an unplanned change of trains towards Freiburg(Breisgau) is required. Continue your journey from Gottenheim with the S1 running at the same time, departing from platform 2. Please check your connection.
Endingen a K Bahnhof → Freiburg Hauptbahnhof
- S42 kbhm
Bad Friedrichshall – Neckarsulm: S41/S42 – partial cancellations at night — (AVG) Bad Friedrichshall – Neckarsulm: S41/S42 – partial cancellations at night Line(s): S41, S42 Period: nights of 26./27. to 29./30.11. (each approx. 20:00 to 06:15) Cancellation: Stadtbahn: Neckarsulm <-> Bad Friedrichshall Hbf Replacement: replacement buses Neckarsulm <-> Bad Friedrichshall Hbf Reason: DB InfraGO – construction work Other: • Caution: restrictions also in the early morning! • Caution: changed departure times Neckarsulm <-> Heilbronn Hbf/Willy-Brandt-Pl. and Bad Friedrichshall <-> Sinsheim/Mosbach, there may be earlier departures due to the connection to the replacement service
Heilbronn Hbf/Willy-Brandt-Pl. → Sinsheim, Hauptbahnhof
- ICE 26 hdwt
Comfort Check-in available - please check in if possible — Comfort Check-in available - please check in if possible
Karlsruhe Hauptbahnhof → Bremen Hauptbahnhof
- RE14 bjbi
Line RE14: No transport of prohibited items possible — Line RE14: No transport of prohibited items possible
Essen Hbf → Borken, Bahnhof
- ICE 33 1ej71
Line 33: Bicycle carriage mandatory reservation — Line 33: Bicycle carriage mandatory reservation
Köln Hbf → Greifswald
- S5 ay42
Stufenloses Fahrzeug, WLAN, WC — Stufenloses Fahrzeug, WLAN, WC
Pforzheim Hauptbahnhof → Knielingen Rheinbergstraße
- ICE 62 92p1
No vehicle-mounted boarding assistance. Please contact the Mobility Service Center for any necessary rebookings. — No vehicle-mounted boarding assistance. Passengers with reduced mobility should contact our Mobility Service Center regarding any necessary rebookings.
Hauptbahnhof → Darmstadt Hauptbahnhof
- S41 x4mn
Bad Friedrichshall - Neckarelz: S41 - One train in each direction is cancelled at night — (AVG) Bad Friedrichshall – Neckarelz: S41 – One train in each direction is cancelled at night Line(s): S41 Period: Monday 07.12. (approx. 21:45 – 23:15) Cancellation: Stadtbahn: one train in each direction is cancelled Neckarelz <-> Bad Friedrichshall • S41 Mosbach (21:42) -> Neckarelz (arr. 21:46, ) from 21:50-> Offenau -> Bad Friedrichshall (arr. 22:08, dep. 22:08 22:41) ->HN Hbf/Willy-Brandt-Pl. (22:37 23:10) • S41 HN Hbf/Willy-Brandt-Pl. (22:18 22:23) -> Bad Friedrichshall (arr. 22:47 22:42, dep. 22:49) -> Offenau -> Neckarelz (arr. 23:07, dep. 23:12) -> Mosbach (23:16) Replacement service: Replacement bus Neckarelz -> Bad Friedrichshall and Bad Friedrichshall -> Mosbach Reason: DB InfraGO – construction work Other: • Caution: changed departure times between Neckarsulm and Heilbronn Hbf/Willy-Brandt-Pl. via Harmonie
Neckarelz, Bahnhof → Mosbach, Bahnhof
- ICE 25 160f2
Universal toilet missing — Universal toilet missing
Nürnberg Hbf → Hamburg, Hamburg Hbf
- S2 nsn1
S2: Train cancellations, diversions and replacement services between Laim/Moosach and Allach/Dachau (29 November to 7 December 2026, continuously) — Due to track work, between Laim/Moosach and Allach/Dachau there will be train cancellations, a diversion and replacement services from Sunday, 29 November 2026, 4 a.m., continuously until Monday, 7 December 2026, 3 a.m. The S2 in/from the direction of Petershausen/Altomünster begins/ends in Allach. The S2 in/from the direction of the city centre will be diverted and begins/ends in Moosach. The additional trains of the 10-minute frequency will not run. From Monday to Friday, trains in/from the direction of Altomünster begin/end in Dachau. Replacement buses run between Allach Bahnhof, Friedhof Untermenzing, Untermenzing Bahnhof, Moosach Bahnhof, München Karlsfelder Straße (MAN) and Dachau Bahnhof at 20-minute intervals. During the day, the service between Moosach and Dachau will be increased to a 10-minute frequency. The transfer between the S-Bahn and the replacement buses takes place in Moosach. Please use, in addition to the diverted S2, the S1 or the U3 from/to Moosach, as a direct transfer between the S2 and the replacement buses is not always possible. The replacement service does not serve Obermenzing. Please use the regular MVG bus lines for Obermenzing, for example line 162 between Pasing, Obermenzing and Moosach or line 180 between Obermenzing and Westfriedhof with a change to the U1.
Ostbahnhof → Moosach
- ICE 28 uvti
Information. — No vehicle-dependent boarding assistance. Passengers with reduced mobility should contact our mobility service center regarding any necessary rebookings.
Nürnberg Hbf → Hamburg, Hamburg-Altona
- RE8 w12
Stuttgart - Würzburg: evening and night train cancellations due to construction works — Due to various construction works, on line RE8 on 5 December and from 7 to 10 December 2026 respectively, there will be train cancellations from around 20:45 to midnight. Please check your connections in advance.
Würzburg Hbf → Hauptbahnhof
- RB63 faq1
Herrenberg - Tübingen: timetable changes at night due to construction works — Due to construction works, on the night of 8./9. December 2026, from approximately 21:30 to 05:15, the trains of the Ammertalbahn RB63 between Tübingen Hauptbahnhof and West are cancelled. Please also note the changed travel times Tübingen West - Herrenberg.
Tübingen Hauptbahnhof → Herrenberg
- ICE 19 rxge
Bicycle carriage not possible — Bicycle carriage not possible
S+U Berlin Hauptbahnhof → Köln Hbf
- IC 35 ydu3
Information. — The side restaurant/bistro is closed. Bicycle carriage is not possible. There is no wheelchair-accessible entrance door on the train. For any necessary rebookings, please contact the mobility service center.
Köln Hbf → Emden Hbf
- S1 13sl1
Line S1: Consumption of alcoholic beverages on the train prohibited — Line S1: Consumption of alcoholic beverages on the train prohibited
Minden, Kaiserstraße → Hannover Hauptbahnhof
- ICE 10 16us5
Construction work. — Due to bridge construction work, the journey time from Hannover towards Berlin is extended by approximately 10 minutes.
Köln Hbf → S+U Berlin Hauptbahnhof
- S2 z9ag
Schorndorf - Weiler/Grunbach: overnight train cancellations with replacement service due to maintenance measures — Due to maintenance measures, the following S2 trains are cancelled overnight on 4./5. December 2026 from approximately 22:00 to 04:15: Schorndorf departures from 21:48 to 23:48 to Weiler, from 00:18 to 03:48 to Grunbach, and at 04:48 to Waiblingen. Weiler departures from 22:07 to 00:37 and Grunbach departures from 01:00 to 04:00 to Schorndorf. Replacement buses depart from Waiblingen or Grunbach or Weiler Rathaus and Schorndorf ZOB.
Filderstadt → Schorndorf
- S3 bt21
Stuttgart - Backnang: overnight timetable changes due to maintenance measures — Due to maintenance measures, the following timetable changes occur in the night of 30 November/1 December 2026: S3 Haltausfälle an der Nürnberger Straße und am Sommerrain in Richtung Waiblingen. Es fahren Ersatzbusse Bad Cannstatt - Fellbach. Ausfall zwischen Backnang und Waiblingen. Es fahren Ersatzbusse Backnang - Waiblingen. MEX19/90 The trains Stuttgart Hbf at 22:26, 22:55 and 00:34 will run to Backnang 10 minutes earlier, and the stops in Bad Cannstatt, Waiblingen and Winnenden will be cancelled.
Backnang → Flughafen/Messe
- RE14 bjbi
Line closure during the evening and night hours between Essen Hbf - Bottrop Hbf and Dorsten — Due to construction measures, some trains on RE 14 line are affected on individual days during the evening and night hours from 26.05. to 12.12.2026 between Essen Hbf and Bottrop Hbf and Dorsten. A replacement service (SEV) is in place.
Essen Hbf → Borken, Bahnhof
- S8 q4kz
Section only 2nd class — Section only 2nd class
Herrsching → Flughafen München
- ICE 19 w9oe
High utilization — High utilization
S+U Berlin Hauptbahnhof → Köln Hbf
- RE1 rhr5
Line RE1: Wi-Fi available — Line RE1: Wi-Fi available
Hamm (Westf), Hauptbahnhof → Aachen, Hbf
- ICE 43 hbbx
Replacement train for ICE 108 between Freiburg(Breisgau) Hbf and Hamburg-Altona. All planned cars are available. — A replacement train is running for ICE 108 between Freiburg(Breisgau) Hbf and Hamburg-Altona. All planned cars are available.
Basel SBB → Hamburg, Hamburg-Altona
- MEX19 vnbe
Elevator at Murrhardt tracks 2/3 out of service. Passengers with reduced mobility can contact the Deutsche Bahn Mobility Service Center (Phone: 030 65212888; Email: msz@deutschebahn.com).
Gaildorf West → Hauptbahnhof
- S5 ay42
Pforzheim Hbf - Söllingen (b Karlsruhe): S5 trains cancelled overnight on part of the section — (AVG) Pforzheim Hbf – Söllingen (b Karlsruhe): S5 trains cancelled overnight on part of the section Line(s): S5 Period: Nights of 14./15.12. – 15./16.12.2026 (each approx. 22:00 to 05:00) Cancellation Tram: Pforzheim Hbf <-> Söllingen (b Karlsruhe) Replacement service: Pforzheim ZOB / Hbf <-> Söllingen Reetztstraße Reason: DB InfraGO – maintenance window Exceptions/Other: • No transfer between replacement service and tram at Söllingen Bahnhof! • On 15.+16.01., for the S5 Pforzheim (01:06) – Söllingen Reetzstraße (01:30) – KA Hauptbahnhof (Vorplatz (01:41) of the SEV, extended differently to KA Hauptbahnhof (Vorplatz) • Note: On the night of 15./16.12., there are simultaneous restrictions for the S5 and S51 in the section Wörth Badepark <-> Wörth (Rhein)
Pforzheim Hauptbahnhof → Knielingen Rheinbergstraße
- RE6 zl4t
Schedule changes RE 6 (KBS 525) — Dear passengers, please note that schedule changes may occur at short notice. These are not always taken into account in the connection search of the electronic timetable information. You can find information about train service restrictions due to construction work and changed timetables on line RE 6 at www.mitteldeutsche-regiobahn.de.
Chemnitz, Hauptbahnhof → Leipzig Hbf
- MEX13 s591
Schorndorf: Haltausfälle wegen Bahnsteigarbeiten — From 12 September to 12 December 2026, the platform at track 2/3 in Schorndorf will be rebuilt. The following schedule changes apply: RE1 The stops in Schorndorf are cancelled; instead, trains will stop in Grunbach in the direction of Karlsruhe and in Endersbach in the direction of Aalen. MEX13 The following trains will have their stops in Schorndorf cancelled: In the direction of Stuttgart at 06:50, 07:20, 07:50, 15:50, 16:20 and 18:50 (Monday to Friday), and at 10:37 and 12:37 (Saturday), as well as from 31 October at 00:37 and 02:37. Replacement stop in Grunbach. In the direction of Aalen from 31 October at 01:20 and 03:20, replacement stop in Endersbach.
Aalen, Hauptbahnhof → Hauptbahnhof
Are there train disruptions right now?
This page lists active network-level disruptions for train services, updated in real time. Train-specific alerts are shown on each train's page.
What does a network disruption mean?
Network disruptions affect train services across a wider area, such as signal failures or track works. They are shown here until they are resolved.