Train disruptions
Current train service disruptions and network alerts, updated in real time.
AI translated
- ICE 20 uf90
Another vehicle. Reduced number of seats. Dining car/Bistro car Car 7. Replacement bicycle spaces in Car 1. Wheelchair-accessible facilities in Car 6. No vehicle-specific boarding aid. In the event of required rebookings, please contact the Mobility Service Center. — The train is running with another vehicle. The train is running with a reduced number of seats. Dining car/Bistro car in Car 7. The replacement bicycle spaces are located in Car 1. Wheelchair-accessible facilities in Car 6. No vehicle-specific boarding aid. Passengers with reduced mobility should contact our Mobility Service Center regarding any necessary rebookings.
Hamburg, Dammtor (Messe/CCH) → Karlsruhe Hauptbahnhof
- ICE 11 syd1
No accessible toilet on the train. Please contact our Mobility Service Center for any necessary rebookings. — No accessible toilet on the train. Passengers with reduced mobility should contact our Mobility Service Center regarding any necessary rebookings.
München Hbf → S+U Gesundbrunnen Bhf (Berlin)
- S1 15isv
S1: Train cancellations with replacement bus service between Nürnberg Hbf and Hartmannshof, from Monday, 16 November 2026 to Thursday, 03 December 2026 — S1: Train cancellations with replacement bus service between Nürnberg Hbf and Hartmannshof, from Monday, 16 November 2026 to Thursday, 03 December 2026
Bamberg → Röthenbach (Pegnitz)
- RB58 12kdp
Line RB58: Consumption of alcoholic beverages on board the train prohibited — Line RB58: Consumption of alcoholic beverages on board the train prohibited
Osnabrück Hbf → Bremen Hauptbahnhof
- MEX17 dik9
Pforzheim - Stuttgart: Night timetable changes due to maintenance measures — Due to maintenance measures, on line MEX17 from the night of 23/24 November to 10/11 December 2026, there will be timetable changes from approximately 21:30 to 05:00 each night, as well as individual train cancellations with replacement buses. Please check your connections in advance.
Bietigheim → Pforzheim Hauptbahnhof
- RB27 16bra
Defective signal box in Buggingen — The section of line from Freiburg(Breisgau) Hbf to Basel Bad Bf is currently affected. We do not yet have any information on the duration of the disruption. The cause is a defective signal box. As a result, delays and partial cancellations are occurring. Please check your connection shortly before the train's departure. Please pay attention to announcements on the train and on the platforms.
Freiburg Hauptbahnhof → Basel Bad Bf
- S4 1dsv9
Schwabstraße - Feuerbach and Zuffenhausen - Weil der Stadt: overnight timetable changes due to construction work — Due to construction work, the following timetable changes apply from approximately 22:00 to 05:00 each night: Night of 8./9. December 2026 S6 The trains from Weil der Stadt at 22:33 and 23:33 are cancelled to Zuffenhausen; the trains at 23:03 and 00:03 are cancelled to Renningen. The trains from Zuffenhausen at 21:57, 22:57 and 23:57 and from Renningen at 22:52 and 23:52 are cancelled to Weil der Stadt. Replacement buses will run. Night of 9./10. December 2026 S4 The trains from Marbach from 21:25 to 23:55 run to Hauptbahnhof (upper level). The trains from Schwabstraße from 22:02 to 01:02 are cancelled to Hauptbahnhof (lower level) and run from Hauptbahnhof (upper level). In addition, the stops at Nordbahnhof and Feuerbach are cancelled. S5 The trains from Bietigheim from 21:07 to 00:07 run to Hauptbahnhof (upper level). The trains from Schwabstraße from 21:52 to 00:52 are cancelled to Hauptbahnhof (lower level) and run from Hauptbahnhof (upper level). In addition, the stops at Nordbahnhof and Feuerbach are cancelled. S6 The trains from Renningen from 21:52 to 01:22 are cancelled to Weil der Stadt. The trains from Weil der Stadt from 22:03 to 05:03 are cancelled to Renningen. Replacement buses will run. The trains from Weil der Stadt from 21:33 to 23:33 run to Feuerbach platform 1a. The trains from Schwabstraße from 22:12 to 00:42 are cancelled to Feuerbach and terminate at platform 1a in Feuerbach. RB76 The trains from Calw from 22:26 to 05:10 are cancelled to Renningen and/or Weil der Stadt. Replacement buses will run. The trains from Renningen from 21:58 to 23:58 and from Weil der Stadt at 04:17 and 04:47 are cancelled to Calw. Replacement buses will run.
Backnang → Schwabstraße
- S4 1dsv9
Backnang/Marbach and Weil der Stadt - Schwabstraße: Night timetable changes due to construction works — Due to various construction and maintenance measures, there will be the following timetable changes in the night of 21./22. December 2026 from approximately 22:00 to 02:00: The S1 will be rerouted between Hauptbahnhof (above ground) and Vaihingen, and the stops between Hauptbahnhof (underground) and Österfeld will be cancelled. There will also be changed running times in the sections Kirchheim (T) - Bad Cannstatt and Herrenberg - Vaihingen. The S3 is cancelled between Bad Cannstatt and Vaihingen and Flughafen/Messe. The S4 is cancelled completely. Replacement buses run Backnang or Marbach - Ludwigsburg Bahnhof (Arena), with the last bus continuing to Hauptbahnhof. The S6 is cancelled completely. Replacement buses run Weil der Stadt - Zuffenhausen, with the last bus continuing to Hauptbahnhof.
Backnang → Schwabstraße
- S 1bx3m
Access to public transport (REX, R, S-Bahn) only with a valid ticket — Access to public transport (REX, R, S-Bahn) only with a valid ticket
Golling-Abtenau → Freilassing
- RB31 1etv3
Repair at a signal in Uhldingen-Mühlhofen — The section of line from Radolfzell to Friedrichshafen Stadt is currently affected. We do not yet have any information on how long the disruption will last. The cause is a repair at a signal. As a result, delays and partial cancellations are occurring. Please check your connection shortly before the train's departure. Please pay attention to announcements over the loudspeakers in the train and on the platforms.
Radolfzell Bahnhof → Friedrichsh. Stadtbahnhof
- RE98 12jkn
Line RE98: air conditioning — Line RE98: air conditioning
Kassel Hauptbahnhof → Gießen Bahnhof
- RB54 nbu5
RB 54 - Revised operating concept with train cancellations and replacement services from 21.11. to 12.12.2026 — Due to diversions in freight and long-distance traffic (required by the general renovation of the Obertraubling–Passau line), a restricted construction timetable will again apply in regional traffic on the Munich–Kufstein corridor from 21.11. to 12.12.2026. Because of diversion traffic on the Munich–Rosenheim axis, approximately every second RB 54 service between Munich Hbf and Rosenheim is cancelled. Passengers can instead take the RE 5, which makes an additional stop at Grafing Bahnhof. In addition, buses run on rail replacement services between Grafing Bahnhof and Rosenheim with all intermediate stops. For part of the time, the running times of the RB 54 change, including on the Rosenheim–Kufstein section.
Kufstein → München Hbf
- S6 s7ts
Stepless vehicle, WLAN — Stepless vehicle, WLAN
Bad Wildbad, Kurpark → Pforzheim Hauptbahnhof
- RE5 1d8hr
Lifts in Göppingen at track 1 and tracks 6/7 out of service. Passengers with reduced mobility can contact the Deutsche Bahn Mobility Service Centre (Telephone: 030 65212888; E-mail: msz@deutschebahn.com).
Friedrichsh. Stadtbahnhof → Hauptbahnhof
- S1 43wb
Plochingen - Herrenberg: Night timetable changes due to construction work — Due to construction work, the following timetable changes will occur on the night of 17/18 December 2026: S1: Rerouting Plochingen - Bad Cannstatt via the freight line, causing trains to stop at Altbach, Zell and Oberesslingen on platform 1, while the stops at Mettingen, Obertürkheim, Untertürkheim and at Neckarpark are cancelled. Please note the changed travel times between Bad Cannstatt and Herrenberg; trains will run up to 5 minutes earlier.
Kirchheim (T) → Herrenberg
- IC 87 szjc
technical validity Deutschlandticket (with partial route issuance) — technical validity Deutschlandticket (with partial route issuance)
Schaffhausen → Hauptbahnhof
- S11 6f29
The train is running with a reduced number of seats, without a train portion to Endingen am Kaiserstuhl. For passengers continuing towards Endingen am Kaiserstuhl, a change at Gottenheim is required. There you have a connection, expected platform 3. Please check your connection. — The train is running with a reduced number of seats, without a train portion to Endingen am Kaiserstuhl. For passengers continuing towards Endingen am Kaiserstuhl, a change at Gottenheim is required. There you have a connection, expected platform 3. Please check your connection.
Neustadt (Schwarzw) Bahnhof → Endingen a K Bahnhof
- ICE 19 rxge
Information. — Another vehicle. Dining car/Bistro car 25 & 35. Bicycles cannot be taken on board. Wheelchair-accessible facilities in cars 24 & 34. In the event of required rebookings, contact the Mobility Service Center.
S+U Berlin Hauptbahnhof → Köln Hbf
- S4 sv3j
Tickets available on board — Tickets available on board
Bad Reichenhall → Freilassing
- RB48 j8so
Line RB48: Air conditioning — Line RB48: Air conditioning
Bonn Lannesdorf Mehlem Bf → Wuppertal Oberbarmen Bf
- IC 35 2l26
No gastronomic offer — No gastronomic offer
Norddeich(Norden) Mole → Köln Hbf
- RE2 650q
A technical disruption on another train in Villingen has been resolved — The section of line from St Georgen(Schwarzw) to Villingen(Schwarzw) is no longer affected. The cause was a technical defect on another train. The route between St. Georgen and Villingen(Schwarzw) is again passable in normal conditions. Please still expect delays and short-term partial cancellations until train traffic stabilizes. Please check your connection shortly before the train departs.
Karlsruhe Hauptbahnhof → Konstanz Bahnhof
- RB68 1395r
Air conditioning — air conditioning
Heidelberg, Hauptbahnhof → Frankfurt (Main) Hauptbahnhof
- ICE 22 t92f
More information shortly — More information shortly
Hamburg, Hamburg Hbf → Hauptbahnhof
- IC87 197fh
Bicycle reservation under 030 2970 or at travel centers + DB agencies — Bicycle reservation under 030 2970 or at travel centers + DB agencies
Singen (Htw) Bahnhof → Hauptbahnhof
- S1 17888
Bridge works in the Schöna – Bad Schandau area — DescriptionDear Sir or Madam, due to bridge works in the Schöna – Bad Schandau area, the following timetable changes will take place from 3 to 12 November as well as on 1 December 2026: Line S 1 (Meißen Triebischtal – Coswig – Dresden – Pirna – Schöna) valid from 3 to 5 November, each time between 07.30 and 19.45, as well as on 6 and 10 to 13 November and on 1 December, each time between 07.30 and 17.30 Cancellation of all trains Bad Schandau ◄► Schöna; replacement service by bus Bad Schandau ◄► Schmilka border crossing Line U 28 Rumburk - Sebnitz - Bad Schandau - Decin hl.n. valid from 3 to 5, 6 and 10 to 13 November as well as on 1 December, each time between 10.30 and 17.30 Cancellation Bad Schandau ◄► Schöna; replacement service by bus; Bad Schandau ◄► Decin hl.n. LinksYou will find the way to the bus replacement service here https://www.vvo-online.de/Umgebungsplan inEFA="true";MeldungTyp="Information"
Schöna Bahnhof → Meißen S-Bf. Triebischtal
- S2 lhxp
S2: Replacement service between Markt Schwaben and Erding (continuous 09.10. to 30.11.26) — Due to track renewal, from Friday, 09.10.26, 21:30, continuously until Monday, 30.11.26, 3:30, there will be replacement bus service between Markt Schwaben and Erding. Due to different level-crossing closures, the buses take a detour between Ottenhofen and Erding, which lengthens journey times. The replacement stops in Altenerding will be relocated on both sides to Münchner Straße at the bus stop "H-Tassilo Realschule". Over the nights Monday/Tuesday, 19./20.10., through Friday/Saturday, 23./24.10., each from 21:00 to 04:00, the replacement service will be extended to the section Ostbahnhof/Riem to Erding. Over the nights Saturday/Sunday, 24./25.10., through Friday/Saturday, 30./31.10., each from 21:45 to 03:30, replacement buses will run between Ostbahnhof and Markt Schwaben/Erding. In addition, there will be cancellations and delays. Please note the separate notice for this. Once construction work is completed on 30.11., the S-Bahn trains can again run at full speed and the S2 will stop again in St. Koloman and Aufhausen.
Moosach → Ostbahnhof
- IC87 197fh
Deutschlandticket valid (without carry-on rule) — Deutschlandticket valid (without carry-on rule)
Singen (Htw) Bahnhof → Hauptbahnhof
- RB83 uxxd
Repair to the infrastructure — Due to a repair to the infrastructure, our trains on lines RE 80 and RB 83 are running slower in the affected sections. This causes delays along the entire route and occasionally partial cancellations. Please check your connection.
Hessental Bahnhof → Heilbronn Hauptbahnhof
- S7 14dae
Rastatt - Achern: S7/S71 cancelled for two weeks — (AVG) Rastatt – Achern: S7/S71 cancelled for two weeks Lines: S7, S71 Period: Monday 23.11. (5:00 a.m.) until Wednesday 09.12.2026 (10:00 p.m.) Cancellation of tram service: Rastatt <-> Baden-Baden <-> Bühl (Baden) <-> Achern Replacement service: • Replacement buses Rastatt <-> Baden-Baden <-> Bühl (Baden) • Achern: Please use RE2 Reason: DB InfraGO – construction work Other: • Individual trains that start and end in Baden-Baden may run • Please note that trains on line RB44 operated by DB Regio are also affected
Rastatt → KA Tullastraße/Alter Schlachthof
- S2 lhxp
S2: Replacement service between Erdweg and Altomünster and timetable changes between Dachau and München Ost (until 02.12.26) — Due to additional renovation work on the track bed, the line between Erdweg and Altomünster is expected to remain closed until 02.12.26 inclusive. Replacement bus service operates between Erdweg and Altomünster. On the night of 23./24.11. from 21:00 to 03:00, replacement service will be extended to Dachau. Between Erdweg and Dachau, shuttle S-Bahn trains run at 30-minute intervals. In and towards München, a change is required at Dachau. The 10-minute-interval S2 trains between Dachau and Ostbahnhof are cancelled. Due to limited capacity, there may be particularly high occupancy of the replacement buses during peak times. From 19.11., departures at 7:12 from Altomünster to Erdweg and at 13:37 from Erdweg to Altomünster will each be supplemented by one additional bus. The replacement stop in Bachern is located at the bus stop within the redesigned P+R car park.
Moosach → Ostbahnhof
- S41 18r60
Neckarsulm – Heilbronn Hbf: S41/S42 will be rerouted at night via the DB route Line(s): S41, S42 Period: Thursday 10.12. (approx. 23:30) to Friday 11.12. (approx. 04:00) Change: • Rerouting of S41/S42 from Neckarsulm via the DB route to Heilbronn Hbf (DB) with an additional stop at HN Sülmertor, and vice versa • In addition, shuttle service S41/S42 between Neckarsulm and Heilbronn Hbf/Willy-Brandt-Pl. via Harmonie – Industrieplatz Reason: DB InfraGO – construction work Other: • Caution: Trains towards Mosbach / Sinsheim begin at Heilbronn Hbf at the DB tracks • Caution: changed departure times between Neckarsulm and Heilbronn Hbf/Willy-Brandt-Pl. via Harmonie
Neckarelz, Bahnhof → Mosbach, Bahnhof
- ICE 25 19sn1
Information. — No wheelchair-accessible entrance door in the train. For any necessary rebookings, please contact the Mobility Service Center.
München Hbf → Hamburg, Hamburg Hbf
- RB30 khmn
Ticket machine on the train — Ticket machine on the train
Neuhaus (Pegnitz) → Nürnberg Hbf
- S1 12tv8
Stepless vehicle, air conditioning — Stepless vehicle, air conditioning
Hochstetten Altenheim → Ettlingen Albgaubad
- IC 56 tax6
Construction work. — The train is unfortunately cancelled. Reason: construction work.
Dresden Hauptbahnhof → Oldenburg(Oldb)Hbf
- S7 14dae
Kuppenheim - Rastatt - Karlsruhe: S7/S8 cancelled on three nights — (AVG) Kuppenheim – Rastatt – Karlsruhe: S7/S8 cancelled on three nights Line(s): S7, S8 Period: - Sunday 29.11. (approx. 22:00) to Monday 30.11.2026 (approx. 4:00) - Monday 30.11. (23:00) to Tuesday 01.12.2026 (04:00) - Wednesday 09.12. (22:00) to Thursday 10.12.2026 (04:00) Cancellation tram: Karlsruhe Tullastraße <-> Rastatt <-> Kuppenheim Replacement service: Karlsruhe Hbf (Vorpl.) <-> Durmersheim <-> Rastatt <-> Kuppenheim Reason: DB InfraGO – construction work
Rastatt → KA Tullastraße/Alter Schlachthof
- RB15 tjvd
Ulm Hauptbahnhof: Hall closed due to renovation until expected spring 2027 — Since September 30, 2024, the reception building of Ulm Hauptbahnhof has been closed due to renovation work by Deutsche Bahn (DB) until expected spring 2027. Track 1 as well as tracks 25 to 28 are accessible barrier-free via the southern station entrance (area between the footbridge and IntercityHotel). All other tracks are accessible via the footbridge. A northern access to track 1 is possible in the area of the DB parking lots. Toilets and lockers are available to travelers there. The station mission is also located here. Tracks 2 to 6 are also accessible barrier-free via the northern pedestrian underpass and the ramp to track 1. The central pedestrian underpass now serves only as a connection between tracks 2 to 8 without access to track 1. The rail replacement service (SEV) departs from the new bus station from platforms J and I. Graphic: New route map Ulm Hbf (Source: DB)
Ingolstadt Hbf → Ulm Hauptbahnhof
- S5 105fo
Wörth Badepark – Wörth (Rhein): S5 section cancelled from 22:00 — (AVG) Wörth Badepark – Wörth (Rhein): S5 section cancelled from 22:00 Line(s): S5 Period: Night of 15./16.12.2026 (22:00 to 05:00) Tram cancellation: Wörth Badepark <-> Wörth (Rhein) Replacement service: Wörth Berufsschule <-> Wörth (Rhein) Reason: DB InfraGO – maintenance window Exceptions/Other: • Note: On the night of 15./16.12., there are simultaneous restrictions on the S5 in the section Pforzheim Hbf <-> Söllingen (b Karlsruhe)
Wörth, Badepark → Söllingen (b. Karlsruhe)
- ICE 25 19sn1
Information. — No vehicle-dependent boarding assistance. Please contact the mobility service center for any necessary rebookings.
München Hbf → Hamburg, Hamburg Hbf
- RE5 18tp1
RE 5 - Revised operating concept with train cancellations and replacement services from 21.11. to 12.12.2026 — Due to diversions in freight and long-distance traffic (required by the general renovation of the Obertraubling–Passau line), a restricted construction timetable will again apply in regional traffic on the Munich–Salzburg corridor from 21.11. to 12.12.2026. Because of diversion traffic on the Munich–Rosenheim axis, the RE 5 supplementary trains between Munich and Traunstein during peak hours must be cancelled. The capacity of the trains before and after these cancelled services is increased. Between Munich and Rosenheim, departure times change: trains in Munich Hbf depart earlier than currently and arrive later there; some trains additionally stop at Grafing Bahnhof. In addition, some midday school trains between Rosenheim, Prien, Traunstein and Freilassing are cancelled. These will be replaced by buses on certain sections.
Salzburg Hbf → München Hbf
- S31 s0fj
Karlsruhe Hbf - Bruchsal: S31 / S32 – Nighttime partial cancellations in December — (AVG) Karlsruhe Hbf – Bruchsal: S31 / S32 – Nighttime partial cancellations in December Line(s): S31/S32 Period: 09.12. / 10.12.2026, approx. 22:00 – 05:00 Cancellation: Tram: each Karlsruhe Hbf <-> Bruchsal Replacement service: each Karlsruhe Hbf (forecourt) <-> Bruchsal Reason: DB InfraGO – construction work
Karlsruhe Hauptbahnhof → Odenheim
- ICE 10 tqlb
Information. — Different vehicle. Reduced number of seats. On-board restaurant/bistro car 26 & 36. Bicycle spaces in car 24 & 34. Wheelchair-accessible facilities in car 22 & 32. In case of required rebookings, contact the mobility service center.
S+U Berlin Hauptbahnhof → Köln Hbf
- RE14a zjkw
Repair work on a signal in Stuttgart-Berghau — The section of line between Stuttgart-Vaihingen and Böblingen is currently affected. We do not yet have any information on the duration of the disruption. The cause is repair work on a signal. As a result, delays and partial cancellations are occurring. Please check your connection shortly before the train's departure.
Rottweil Bahnhof → Hauptbahnhof
- RB69 lazb
RB 69: Schedule changes and transfer in Kaufering from 17.08. to 10.12.26 — Due to construction work, on line RB 69 all day from 17.08. to 10.12.2026 between Landsberg and Kaufering there will be schedule changes and later departure times. In Kaufering, you must transfer to continue to Augsburg or Landsberg. Further information can be found in the attached construction site timetable.
Augsburg Hbf → Kaufering
- S1 12tv8
Karlsruhe Hbf (Vorplatz) - Ettlingen: Section of S1/S11 cancelled from 20:00 — (AVG) Karlsruhe Hbf (Vorplatz) – Ettlingen: Section of S1/S11 cancelled from 20:00 Lines: S1/S11 Period: Nights 15.12./16.12. - 16.12./17.12.2026 (each 20:00 - 04:10) Cancellation of tram: Karlsruhe Hbf (Vorplatz) <-> Ettlingen Stadt Replacement service: • Karlsruhe Hbf (Vorplatz) <-> Ettlingen Stadt • In the direction of Karlsruhe city centre, the transfer from SEV to tram takes place at the stop Poststraße Reason: Construction work by AVG (urgently necessary rail grinding works in Karlsruhe Rüppurr) Exceptions/Other: The running times of the last trains to Hochstetten as well as the respectively last train to Ittersbach and Bad Herrenalb have been adjusted: • S1 Ettlingen Stadt (00:31) (00:58) – Bad Herrenalb (00:53) (01:22) • S11 Ettlingen Stadt (00:51) (01:18) – Ittersbach Rathaus (01:15) (01:42) • S1 Karlsruhe Hbf (Vorplatz) (00:25) (00:45) – Hochstetten (01:16) (01:36) • S1 Karlsruhe Hbf (Vorplatz) (00:45) (01:05) – Hochstetten (01:36) (01:56)
Hochstetten Altenheim → Ettlingen Albgaubad
- S8 1eg52
S3/S4/S6/S8: Construction work at Laim station (25 August 2026 to approximately mid-2028) — From 25 August 2026, due to construction work at Laim station until mid-2028, changes to journeys towards the Munich city centre should be expected. These changes affect only journeys towards the city centre. For journeys out of the city, all S-Bahn trains will continue to stop at Laim as usual. Passengers travelling from the direction of Pasing and taking lines S3, S4, S6 or S8 to Laim: These lines will no longer stop at Laim station towards the city centre. Passengers wishing to travel to Laim are asked to continue by S-Bahn to Hirschgarten, change platforms on the same platform there, and then take the next S-Bahn back to Laim. With a ticket valid for Laim, it is possible to continue to Hirschgarten and then back to Laim. The additional change may increase journey time. Passengers are advised to check connection information before departure, to observe the current passenger information in the train and at the station, and to allow extra time in particular at the beginning of the school year and in the first days of operation. In brief: Construction work at Laim station from 25.08.2026 to approximately mid-2028 Lines S3, S4, S6 and S8 do not stop in Laim towards the city centre. There are no changes towards the city outskirts. Passengers with Laim as their destination are asked to continue to Hirschgarten, change there, and take the next S-Bahn back to Laim. No additional ticket required. Lines S1, S2 and S5 are unaffected and will continue to stop at Laim in both directions.
Herrsching → Flughafen München
- RE60 kmjs
RE60 Line: Air conditioning — RE60 Line: Air conditioning
Braunschweig, Hauptbahnhof → Rheine, Bahnhof
- ICE 41 sfjs
Information. — No accessible toilet in carriage 35. Passengers with reduced mobility should contact our mobility service center regarding any necessary rebookings.
Nürnberg Hbf → Dortmund Hbf
- MEX13 s591
Schorndorf: Underpass at the station closed due to construction work, changed departure tracks — track closures due to the renewal of the Bf Schorndorf From 3 October 2026, 5:00 a.m.: Track 3 is continuously closed, until expected 7 January 2027. Trains heading to Stuttgart stop at Track 4. Various MEX13 trains cannot stop in Schorndorf due to train length; these also stop in Grunbach. RE1 line trains cannot stop in Schorndorf. Replacement stops: in the direction of Stuttgart in Grunbach, in the direction of Aalen in Endersbach. The lift to platform Track 4/5 is not yet in operation. The displays at platform Track 4/5 are not yet available. From Track 4/5 there is no passage through the pedestrian underpass to the platforms at Tracks 2/3, 1/14 and to the town centre. A diversion via Grabenstraße has been set up; please note the longer walking distance.. Closure of the pedestrian underpass The PU will remain closed until 5 February 2027. The reason is the section-by-section renewal of the ceilings under platforms Track 4, 3 and 2. Due to the construction method of the PU, larger interventions in walls and ceilings are necessary, so a safe passage is not possible during the works.
Aalen, Hauptbahnhof → Hauptbahnhof
Are there train disruptions right now?
This page lists active network-level disruptions for train services, updated in real time. Train-specific alerts are shown on each train's page.
What does a network disruption mean?
Network disruptions affect train services across a wider area, such as signal failures or track works. They are shown here until they are resolved.