Timetable only
Next stop: Dolní Ostrovec 19:11Arrives: Březnice 19:40
Train Os 7957
Dolní Ostrovec → Březnice
Follow the real-time schedule of train Os 7957 (Dolní Ostrovec - Březnice).
- Dolní Ostrovec19:11
- Smetanova Lhota19:15
- Čimelice19:19
- Horní Nerestce19:24
- Mirovice19:28 (Stop: 1 min)
- Myslín19:32
- hr.VUSC 0200/0310 0319:35
- Dobrá Voda u Březnice19:36
- Březnice19:40
What is the route of Os 7957?
Os 7957 follows the route: S66.
How long is the journey of Os 7957?
The scheduled journey of Os 7957 takes approximately 29 minutes.
What type of train is Os 7957?
Os 7957 is a S66 train.
Os 7957
Punctuality history
Punctuality
Average delay
Daily average delay
Minutes vs. schedule